ADUs and rules
Thurston County ADU Rules Changed in December 2025. Here Is What Applies Now

The short answer
On 16 December 2025 the Board of County Commissioners adopted Ordinance 16575 as part of Thurston 2045, and it rewrote the ADU rules. Inside the urban growth areas you can now have up to two ADUs on one lot. In the rural county you get one, it has to sit within 100 feet of the main house, and it has to share the main driveway.
Family member units are gone entirely.
And check whatever you read against the ordinance itself. The county warns that an adopted code can take up to six months to reach Municode, and these changes were not there when they were adopted. A lot of what is still online was written from the rules they replaced.
An accessory dwelling unit is a second, smaller home on the same lot as your house.
It can be attached, like an apartment over the garage. Or detached, which is what most people mean by a backyard cottage, a DADU or a mother-in-law unit. Either way it needs its own kitchen, bathroom and somewhere to sleep.
Most people build one to house family or to earn rent. The rules below decide how many you can have and how big they can be. The building side is on our ADU and DADU page.
Check the ordinance, not just the code database
Most people researching an ADU land on Municode. That is where county code lives, it is what search engines surface, and it is what most AI answers are built from.
Thurston County says on its own ADU page that a new code can take up to six months to show up in Municode. When these changes were adopted on 16 December 2025, they were not there yet.
The county tells you to read Ordinance 16575 instead.
What that means in practice
Between December 2025 and roughly mid 2026 there were two versions of the Thurston County ADU rules in public circulation: the adopted one, and the one still showing in the code database. Plenty of blog posts, contractor pages and AI summaries were written from the wrong one.
If something you read about Thurston County ADUs does not mention two units per lot in the UGAs, or still refers to family member units, it is out of date.
What changed in December 2025
- Family member units are no longer permitted.
- One ADU per lot is permitted in the rural area.
- Detached ADUs are permitted in the rural area and no longer require additional land.
- Size cap of 1,000 square feet, which a transferable development right can raise to 1,200.
- A rural ADU must sit within 100 feet of the primary residence, unless there are limiting circumstances.
- It must share the primary driveway.
The detached change matters more than it sounds. The old rural rules made a detached unit hard to fit on an ordinary lot.
Now what counts is how close it sits to the house and how you reach it, not how much land you own.
Urban growth areas: up to two ADUs per lot
This is the headline. Inside a county urban growth area you can have two accessory dwelling units on one lot.
The UGAs are Olympia, Lacey, Tumwater, Grand Mound, Yelm, Rainier and Tenino.
You can arrange the two units in any of three ways:
- One attached ADU and one detached ADU.
- Two attached ADUs.
- Two detached ADUs, which may be in either one building or two separate buildings.
The third option is worth pausing on. Two detached units in one building is really a duplex-shaped backyard building.
On many plots, that uses the ground better than two separate cottages.
| Rural unincorporated | Inside a UGA | |
|---|---|---|
| ADUs per lot | One | Up to two |
| Detached allowed | Yes, no extra land needed | Yes, one or two structures |
| Detached ADU size | 1,000 sq ft, or 1,200 with a TDR | 1,000 sq ft gross floor area |
| Distance from main house | Within 100 ft unless limited | Not specified at county level |
| Driveway | Must share the primary driveway | Not specified at county level |
| Attached ADU size | No more than 50% of the main house | 1,000 sq ft gross floor area |
What counts as 1,000 square feet
State law (RCW 36.70A) says size limits inside a UGA must allow 1,000 square feet of gross floor area.
Gross floor area means the living space inside. The county is clear that basements and attics count.
So a 700 square foot ground floor with a 300 square foot loft is already at the cap. If you are designing close to the limit, count the loft.
Water and septic, which is where rural projects stall
This is what most often turns a quick rural ADU into a slow one.
- Rural lots need approved water and septic.
- Inside a UGA you need approved water and septic, or a connection to water and sewer.
- Either way you need a Certificate of Water Availability, a COWA.
- And the project has to meet county code 14.48.100(B).
A second home means more bedrooms on the same septic system. If yours was sized for the house alone, it may need enlarging or replacing.
That is a big cost with nothing to show for it. Find out early, not late.
Which code applies to you
Thurston County uses a different zoning title depending on which urban growth area you are in. This one is easy to get wrong.
| Where you are | Which county code title |
|---|---|
| Olympia UGA | Title 23 |
| Lacey UGA | Title 21 |
| Tumwater UGA | Title 22 |
| Grand Mound, Yelm, Tenino, Rainier UGAs | Title 20 |
| Rural unincorporated | Chapter 20.34 |
Now the distinction that catches people out. Being in the Olympia urban growth area is not the same as being in Olympia.
If you are in the UGA but outside the city limits, the county permits your project, not the city.
The pre-approved plans, if you are inside a city
Olympia, Lacey and Tumwater share a set of pre-approved ADU plans, each with exterior options. Lacey lists four sizes, from a 480 square foot studio to an 800 square foot two bedroom.
Use one and you are not paying for drawings from scratch. Review is quicker too, because the plan has already been through it.
What it does not cover is your site. The survey, the setbacks, the utility runs, the septic, the critical areas.
Those are still yours, and they are usually where the real cost and the real delay sit. A pre-approved plan saves you design time, not project time.
The overlays that can override all of this
Meeting the ADU rules is necessary. It is not always enough. Three other sets of rules can apply, and any one of them can change what you can build.
- The Shoreline Master Program, if you are near water. In this county a great many lots are.
- The Critical Areas Ordinance, covering wetlands, steep slopes, habitat and geological hazards.
- The Health Code, which is usually the septic question in another form.
Check these before you fall in love with a design. It is far cheaper to learn at the sketch stage that half your yard is a protected wetland buffer.
Talk to the county before you draw anything
The county runs four levels of help at the Building Development Center, and the cheapest one is free.
Most people skip it and pay for it later in redesign.
| What you get | Service | Cost | Time |
|---|---|---|---|
| Basic zoning questions, forms, next steps | Walk-in | Free | 15 min |
| How the code applies to your project and the major issues in it | Planner consultation | $30 plus 5% tech fee | 30 min |
| Whether the project is feasible, and decisions on size and location | Concept review | $120 plus 5% tech fee | 30 min plus staff prep |
| Every permit, review and submittal confirmed in depth | Presubmission conference | $1,372 plus 5% tech fee | 1 hr plus staff prep |
Walk-ins are Monday to Friday, 8am to 1pm, no appointment, with the last ticket at 12:30pm. That window also covers submitting permits and paying fees. Appointments run from 1:30pm to 4pm.
The paid tiers are in person and need booking. A concept review wants your application a week ahead, with early sketches, square footage and rough locations. A presubmission conference expects engineer or architect drawings.
Which tier you actually need
For a single ADU the concept review is usually the right level. The presubmission conference at $1,372 is built for complex projects and is rarely what one accessory dwelling calls for.
A $120 review that tells you your septic will not carry a second dwelling has just saved you a design fee and several months.
How long a permit stays alive, and what changed in March 2026
Title 14 of county code runs two separate clocks. In March 2026 the county clarified where one ends and the other begins.
- An application expires if there is no activity on it for one year.
- An issued permit expires if construction does not begin within one year.
The gap between them used to catch people out. A project could be reviewed and marked ready to issue, then sit there because nobody collected the permit and paid.
The county has now confirmed it stays an application until you pay. Paying is what issues the permit and starts the second clock.
Reached ready to issue over a year ago? The county is setting up a process to request a one-year extension, counted from the date the permit would have been issued.
From now on, once a permit is issued you have a year to start work or ask for more time.
Why this one matters for an ADU
ADU projects stall more often than most, usually on septic or water availability. That makes it easy to drift past a deadline you did not know was running.
If your ADU permit has been sitting at ready to issue, ask about the extension process rather than assuming you have to start over.
A sensible order to do this in
- Work out whether you are inside a city, inside a UGA but not the city, or rural. This determines everything else.
- Confirm how many units you are allowed. Two in the UGAs, one rural.
- Get the septic or sewer question answered before you design anything.
- Request the Certificate of Water Availability.
- Check the shoreline, critical areas and health overlays.
- Book a concept review with the county before you pay anyone to draw plans.
- Only then decide between a pre-approved plan and a custom design.
- Budget for the site work separately from the building.
Common questions
How many ADUs can I build in Thurston County?
Up to two on one lot inside the urban growth areas of Olympia, Lacey, Tumwater, Grand Mound, Yelm, Rainier and Tenino. One per lot in the rural unincorporated county. This changed with Ordinance 16575, adopted 16 December 2025.
Are family member units still allowed in Thurston County?
No. Family member units were removed when the county adopted its 2025 comprehensive plan amendments on 16 December 2025. If you find a page describing them as an option, that page is out of date.
How big can an ADU be in Thurston County?
Inside the urban growth areas the limit is 1,000 square feet of gross floor area, which includes basements and attics. In the rural county a detached ADU is capped at 1,000 square feet, or 1,200 if a transferable development right is used, while an attached one is limited to 50 percent of the size of the main house.
Can I build a detached ADU on a rural lot?
Yes. Detached ADUs are permitted in the rural area and no longer require additional land. It must sit within 100 feet of the primary residence unless there are limiting circumstances, and it must share the primary driveway.
Why does the county code I found online say something different?
Because it probably has not caught up. Thurston County states that adopted codes can take up to six months to appear in Municode, and that as of 16 December 2025 these ADU changes were not yet reflected there. Ordinance 16575 is the current authority.
Do I need a new septic system for an ADU?
Possibly. A second dwelling adds load to the system, and if the existing one was sized only for the main house it may need expanding or replacing. You will also need a Certificate of Water Availability and to meet county code 14.48.100(B). Answer this before you design, because it is the most common reason a rural ADU stalls.
How much does it cost to ask Thurston County about my ADU?
Nothing for a walk-in, which covers basic zoning questions, forms and next steps, Monday to Friday between 8am and 1pm. A 30 minute planner consultation is $30, a concept review is $120 and a presubmission conference is $1,372. Every paid tier adds a 5 percent technology fee. For a single ADU the concept review is usually the right level.
How long is a Thurston County permit valid?
An application expires after a year with no activity, and an issued permit expires if construction does not start within a year of issue. The county clarified in March 2026 that a project stays an application until you pay and the permit is issued, which is what starts the second clock. Projects that reached ready to issue more than a year ago can request a one-year extension.
Is being in the Olympia urban growth area the same as being in Olympia?
No, and the difference matters. If your property is inside the UGA but outside the city limits, the county handles your permit under Title 23, not the City of Olympia.
Where to go from here
We build ADUs and detached ADUs across Olympia, Lacey, Tumwater and the rest of Thurston County, on foundations rather than wheels.
Thinking smaller than an ADU? A tiny house has its own rules, and we cover them in tiny homes on a foundation or on wheels.
Tell us your address and we will tell you which rules apply to your lot, how many units you can have, and what the site is likely to demand before anything gets built.
Code requirements on this page were last checked on 7 October 2026. Codes change, so confirm current standards with your city or county before you apply.
Planning a deck in Thurston County?
We handle the permit work as part of the build. Tell us the site and what you want.
Where this applies
We work in every one of these towns, and each has its own page covering the rules that apply there.