Home Remodeling in
Edgewood, WA
Edgewood allows some of the largest accessory dwellings in the area, up to 1,600 square feet. The part that decides the timeline is water and sewer or septic approval.
Remodeling in Edgewood
What building in Edgewood actually involves
Edgewood sits on the hill between Puyallup and Milton, and it is a city where many owners look at additions, shops and accessory dwellings.
It also means utilities matter more than usual. Some properties are on sewer and others rely on septic, and the permit process is built around proving which one you have.
Bigger ADUs than most neighbours allow
Edgewood allows up to two ADUs per lot. Each can have up to 1,000 square feet of living space, or 80 percent of the main house's living space if that is larger, with a cap of 1,600 square feet. On a big house, that is room for a real second home rather than a studio.
A detached ADU can be as tall as the main house or 24 feet, whichever is greater. It needs a permanent foundation, and it has to meet the city's residential design standards, which are reviewed at the same time as the building permit.
The city updated these rules in June 2025.
Water and sewer or septic come first
The city's ADU submittal checklist, revised in April 2026, asks for a water availability letter signed by your water purveyor, showing the nearest hydrant and the fire flow available.
It also asks you to prove your sanitary connection. On septic, that means approval from the Tacoma-Pierce County Health Department with a stamped site plan showing the system's location and the number of bedrooms it allows. A community septic system or a sewer connection each has its own proof, and the connection permit has to be issued before the building permit.
A geotechnical report is added where there are soft soils, landslide or seismic hazards, and a school impact letter is due before the permit is issued. Starting the utility approvals early is the single best way to keep an Edgewood ADU on schedule.
Renting it out, and legalizing an existing unit
If the ADU will be rented, Edgewood requires a city business license for the rental.
Units built in the past without approval can be brought into compliance using the same standards as a new ADU. Once approved, the owner records a title notice showing the unit was legally built. The city can also exempt the conversion of an existing legal building from setback, height and coverage standards.
City requirements on this page were last checked on 15 September 2026. Codes change, so confirm current standards with the city before you apply.
What We Build
Our services in Edgewood
Client Reviews
What our clients say
โI have worked with KOI on multiple projects and will definitely continue to do so. His drive for excellence and perfection is amazing, great communication for everything going on with projects. for the quality of work this company provides they are decently priced and everything is laid out in front of you for a clear well managed project. I would highly recommend reaching out to Chris if you are looking to do any project, big or small.โ
Deck construction ยท Demolition ยท Roof repair ยท Exterior painting
โChris, owner of KOI build is a great guy. He personally made sure that the reconstruction of our deck was as we wanted and made sure his workers were following the things we expected. They did a great job on a hard project. All supplies and costs were explained and options given. After completion the work site was thoroughly cleaned everything hauled away. Everyone working on the project was very personable. Chris went out of his way to make sure we were happy with the results even coming over and doing painting on a Sunday to help out. This is a good company with very nice and helpful people. I would highly recommend them for any home improvement needs.โ
Deck construction
Common Questions
Remodeling in Edgewood, answered
How big can an ADU be in Edgewood?
Up to 1,000 square feet of living space, or 80 percent of the main house's living space if larger, to a maximum of 1,600 square feet. Two ADUs are allowed per lot.
What do I need for septic on an Edgewood ADU?
Approval from the Tacoma-Pierce County Health Department, with a stamped site plan showing the septic system and the number of bedrooms allowed. Sewer and community septic connections have their own proof requirements.
Do I need a business license to rent an ADU in Edgewood?
Yes. Edgewood requires a business license if the ADU is made available for rent.
Can an unpermitted ADU be legalized in Edgewood?
Yes, using the same standards as a new ADU, followed by a title notice showing the unit was legally built.
Do you work in Edgewood?
Yes, across Edgewood and the rest of Pierce County. Call (253) 348-1847 for a free estimate.
Service Area
Where we work in Edgewood
More Areas
Other areas we serve
- TacomaPierce County
- LakewoodPierce County
- PuyallupPierce County
- Gig HarborPierce County
- SteilacoomPierce County
- DuPontPierce County
- SpanawayPierce County
- FircrestPierce County
- University PlacePierce County
- MiltonPierce County
- Browns PointPierce County
- Lake TappsPierce County
- LaceyThurston County
- TumwaterThurston County
- YelmThurston County
- SheltonMason County
- TeninoThurston County
- CentraliaLewis County
- ChehalisLewis County
- OlympiaThurston County
Planning a project in Edgewood?
Free estimates, and a straight answer on what your project will cost and how long it will take.